James D. Wetherbee
(Sixth Space Flight)
Paul S. Lockhart
(Third Space Flight) Mission Specialist 1:
Michael Lopez-Alegria
(First Space Flight) Mission Specialist 2:
John B. Herrington
(Third Space Flight) Mission Specialist 3: Exp.6
Kenneth D. Bowersox
(Second Space Flight) - Exp. 5 Mission Specialist 3:
Valery G. Korzun, RKA
(First Space Flight)  - Exp. 5 Mission Specialist 4:
Nikolai M. Budarin, RKA
(Third Space Flight) ISS Flight Engineer - Exp. 6 Mission Specialist 4:
Peggy A. Whitson
(First Space Flight) ISS Flight Engineer - Exp. 6 Mission Specialist 5:
Donald R. Pettit
Sergei Y. Treshchov, RKA
(First Space Flight) ISS Flight Engineer - Exp. 5 Mission 5:
STS-113 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Endeavour. During the 14-day mission in late 2002, Endeavour and its crew extended the ISS backbone with the P1 Truss and exchanged the Expedition 5 and Expedition 6 crews aboard the station. With Commander Jim Wetherbee and Pilot Paul Lockhart at the controls, Endeavour docked with the station on 25 November 2002 to begin seven days of station assembly, spacewalks and crew and equipment transfers. This was Endeavour’s last flight before entering its Orbiter Major Modification period until 2007, and also the last shuttle mission before the Columbia disaster.
ISS Expedition - 5
ISS Expedition - 6
(Second Space Flight)



























Study
Research
Main Index
Space Cosmology
Science Research
*
About
Science Research
Science Theories
Desk
Site Map
BookShelf




Copyright ©  by Nigel G Wilcox  ·  All Rights reserved  ·  E-Mail: ngwilcox100@gmail.com
Designed by Nigel G Wilcox
Powered By AM3L1A
Pages within this section: USA Shuttle Mission Flights

STS-113

Pages within this section:
The Space Shuttle Missions
Astronauts:                        
STS-113
Command Pilot:
Pilot:
108
M
8
SM
Sub-Menu
menu
-
109
111
112
113
114
115
110
STS-113 was an Assembly Mission (11A) to the International Space Station, delivering the P1 Truss segment, which provides structural support for the Space Station radiators. Mission Specialists John Herrington and Michael López-Alegría performed three spacewalks to activate and outfit the P1. The STS-113 crew and both Expedition crews transferred about 1,969 kilograms (4,340 pounds) of cargo between the shuttle and station.

STS-113 delivered the Expedition 6 crew to the station for a four-month increment. The Expedition 5 crew returned to Earth aboard STS-113, ending a 185-day stay in space.

STS-113 came to a close when Endeavour glided in to a landing at Kennedy Space Center on 7 December. It was the 19th flight of Endeavour, the 112th shuttle mission, and the 16th shuttle mission to the station. The landing was the first (and only) time a mission ended on the fourth day of landing attempts.

Also carried aboard STS-113 was the Micro-Electromechanical System (MEMS) based Pico Satellite Inspector (MEPSI). This payload deployed two small satellites which are connected via a 15 metres (49 ft) tether.

STS-113 was the last successful mission before STS-107. Gus Loria was originally scheduled to fly as the pilot for this mission, but was replaced due to an injury. His replacement was Paul S. Lockhart. John Herrington, a member of the Chickasaw Nation, became the first enrolled member of a Native American tribe to fly in space.

STS-113 was the final mission during which Russian cosmonauts flew on the Space Shuttle.

Because Endeavour entered its Orbiter Major Modification period after the Columbia disaster, this was the last shuttle mission to fly with an analog-style cockpit.
opez-Alegria climbs the newly-installed P1 truss during the mission's second EVA