Michael J. Bloomfield
(Third Space Flight)
     
Stephen N. Frick
(First Space Flight) Mission Specialist 1:
Jerry L. Ross
(Fourth Space Flight) Mission Specialist 2:
Steven L. Smith
(First Space Flight) Mission Specialist 3:
Ellen L. Ochoa
(Fourth Space Flight) Mission Specialist 5:
Lee M. E. Morin
(Seventh Space Flight) Mission Specialist 4:
Rex J. Walheim
(First Space Flight)
STS-110 was a Space Shuttle mission to the International Space Station (ISS) on 8-19 April 2002 flown by Space Shuttle Atlantis. The main purpose was to install the S0 Truss segment, which forms the backbone of the truss structure on the station.



























Study
Research
Main Index
Space Cosmology
Science Research
*
About
Science Research
Science Theories
Desk
Site Map
BookShelf




Copyright ©  by Nigel G Wilcox  ·  All Rights reserved  ·  E-Mail: ngwilcox100@gmail.com
Designed by Nigel G Wilcox
Powered By AM3L1A
Pages within this section: USA Shuttle Mission Flights

STS-110

Pages within this section:
The Space Shuttle Missions
Astronauts:                        
STS-110
Command Pilot:
Pilot:
108
M
8
SM
Sub-Menu
menu
-
109
111
112
113
114
115
110
The main purpose of STS-110 was to attach the stainless steel S0 Truss segment to the International Space Station (ISS) to the Destiny Laboratory Module. It forms the backbone of the station to which the S1 and P1 truss segments were attached (on the following missions STS-112 and STS-113, respectively).

STS-110 also delivered the Mobile Transporter (MT), which is an 885 kilograms (1,951 lb) (1,950 lb) assembly that glides down rails on the station integrated trusses. The MT was designed and manufactured by Astro Aerospace in Carpinteria, CA. During the next shuttle mission, STS-111, the Mobile Base System (MBS) was mounted to the MT. This Mobile Servicing System (MSS) allows the Canadarm2 to travel down the length of the installed truss structure.

Flight Day 1: Launch
After a launch scrub on 4 April 2002 due to a hydrogen leak, Space Shuttle Atlantis successfully launched on 8 April 2002, from Launch Complex 39B. The countdown on 8 April encountered an unscheduled hold at the T-5-minute mark due to data dropouts in a backup Launch Processing System. The Launch Processing System team reloaded the required data and the countdown resumed. Liftoff occurred with 11 seconds remaining in the launch window.

STS-110 was the first shuttle mission to feature the upgrade Block II main engines, which featured an "improved fuel pump...a stronger integral shaft/disk, and more robust bearings". The intent of the upgrade was to increase the flight capacity of the engines, while increasing reliability and safety.

With the launch of Atlantis, mission specialist Jerry Ross became the first human to have traveled to space seven times
 
Take-off Launch Attempts 4th Apr 2002 Scrubbed
08th April 2002 Successful.
Space walks 4 between 11th Apr to 16th April 2002 Each lasting under 8 mins.
Canadarm2 grapples the first segment of the ISS' Integrated Truss Structure
Astronaut Lee Morin on the second spacewalk