The launch was on 24 November 1991 at 6:44:00 pm EST. A launch set for 19 November was delayed due to replacement and testing of a malfunctioning redundant inertial measurement unit on the Inertial Upper Stage booster attached to the Defense Support Program satellite. The launch was reset for 24 November and was delayed 13 minutes to allow an orbiting spacecraft to pass and to allow external tank liquid oxygen replenishment after minor repairs to a valve in the liquid oxygen replenishment system in the mobile launcher platform. Launch weight was 117,766 kilograms (259,630 lb).
Pilot:
41g
M
8
SM
Sub-Menu
menu
-
42
43
44
45
46
47
48
A free template by Lucknowwebs.com for WYSIWYG WebBuilder 8
Astronauts:
STS-44
Study
Research
Main Index
Space Cosmology
Science Research
*
About
Science Research
Science Theories
Desk
Site Map
BookShelf
Copyright © by Nigel G Wilcox · All Rights reserved · E-Mail: ngwilcox100@gmail.com
Designed by Nigel G Wilcox
Powered By AM3L1A
Pages within this section: USA Shuttle Mission Flights
STS-44
Pages within this section:
Command Pilot:
The Space Shuttle Missions
The mission was dedicated to the Department of Defense. The unclassified payload included a Defense Support Program (DSP) satellite and attached Inertial Upper Stage (IUS), deployed on flight day one. Cargo bay and middeck payloads included the Interim Operational Contamination Monitor (IOCM), Terra Scout, Military Man in Space (M88-1), Air Force Maui Optical System (AMOS), Cosmic Radiation Effects and Activation Monitor (CREAM), Shuttle Activation Monitor (SAM), Radiation Monitoring Equipment III (RME III), Visual Function Tester-1 (VFT-1), Ultraviolet Plume Instrument (UVPI), Bioreactor Flow, Particle Trajectory experiment, and Extended Duration Orbiter Medical Project, a series of investigations in support of Extended Duration Orbiter.
The landing was on 1 December 1991 at 2:34:44 pm PST, Runway 5, Edwards Air Force Base, California. The rollout distance was 11,191 feet (3,411 m), and the rollout time was 107 seconds. The landing weight was 193,825 pounds (87,918 kg). The landing was originally scheduled for Kennedy Space Centre on 4 December, but the ten-day mission was shortened and the landing rescheduled following the 30 November on-orbit failure of one of three orbiter inertial measurement units. The lengthy rollout was due to minimal braking for test. Atlantis returned to Kennedy on 8 December.
Atlantis deploys a DSP satellite.